Manufacturing teams track multiple performance metrics—but understanding how they relate is key to improving operations.
Three of the most important metrics are:
- OEE (Overall Equipment Effectiveness)
- Downtime
- Throughput
What is OEE (Overall Equipment Effectiveness)?
OEE measures how efficiently equipment is operating by combining:
- Availability
- Performance
- Quality
What is Downtime?
Downtime is the amount of time equipment is not running when it should be.
This includes:
- Breakdowns
- Changeovers
- Waiting on parts or operators
Downtime directly reduces OEE.
What is Throughput?
Throughput measures how much product is produced over time.
It reflects:
- Production speed
- Output volume
- Capacity
How They Work Together
- More downtime = lower throughput and lower OEE
- Slower speed = lower throughput and lower OEE
- Poor quality = lower OEE and wasted production
Which Metric Matters Most?
OEE is the most complete metric because it combines all three factors.
However, downtime and throughput help identify root causes.
How WorkTrek Helps
WorkTrek CMMS helps improve all three by:
- Tracking downtime in real time
- Automating preventive maintenance
- Improving visibility across assets
- Delivering centralized dashboards
See Your Performance Opportunity
We offer a FREE proof of concept and a 48-hour OEE gap analysis.
Book here:
https://meetings.hubspot.com/alan-finney
Leave a comment